Empowering Progress,

Shaping The Future

Your one-stop permit application hub for all utility projects

KUS KUS

KUS E-Application

This online platform allows construction professionals to apply and obtain necessary approvals or licenses before starting their underground utility projects in the most convenient way.

How It Works

Below is the structure of approval process by the Sabah utility authorities.

01

Registration & Application

  • Register an Account
  • Start e-Application
  • Site Visit
  • UDM

02

Processing Wayleave

  • Documents Submission
  • Wayleave Approval
  • Wayleave Issued

03

Processing Permit

  • Documents Submission
  • Permit Approval
  • Permit Issued

04

Start Work

  • Start Utility Works
  • As-Built
  • Site Visit

05

CPC / CCC Issuance

  • CPC Issuance
  • CCC Issuance

Frequently Asked Questions

Please refer to our FAQ section on the website for answers to commonly asked questions.

It is an online permit application for the purpose of utility works by applicants.
The current practice is to submit all relevant documents in hardcopy for an application. With KUS portal, most documents will be submitted in soft-copy. However, original signed hard copy papers are still required for submission to local authorities.
  • Applicants from Sabah will be able to submit their application online.
  • Payment for Application Fees can be made online.
  • Applicants will be able to keep track of their application status online, eg. site visit, UDM status, permitting stage, etc.
A notification of the application status and the outstanding requirements will be sent to the applicant`s login dashboard in KUS Portal and via email to notify if applicant`s further action is required.
KUS can be contacted at +608-838 3351 / 3314 and the applicant will be transferred to the person in charge of KUS Portal for troubleshooting of the problems faced.
Yes, payment can be made through KUS e-Application Web Portal using online banking or credit cards. If you have made offline payment such as cheque, kindly email us the proof of bank-in slip.
  • A permit will take approximately 3-4 weeks after initial payment is made by applicant and complete documentation is submitted to the Local Authority. This timeline is subject to all obligations being fulfilled by the applicant:
  • Payment of security bond (Wang Amanah) to Local Authority
  • Payment of "Wang pemprosesan" to local authority (if require)
  • Complete submission of documentation (Insurance, Work schedule, Method Statement, etc.)
No, all documents will now be uploaded through the KUS Portal for records. Nevertheless, local authorities still require some original signed hard copy documents to be submitted.
Koridor Utiliti Sabah Sdn Bhd 202101003156 (1403454-M)
Unit No. P1/D/19/5, Fifth Floor, Block D, KK Times Square Signature Office, Off Coastal Highway, 88100 Kota Kinabalu, Sabah, Malaysia

Get Started Now

Register now to unlock access and start utilizing our services today!